Thales Group runs many simulations to test the track controls that they produce, which can involve hundreds or thousands of scenarios that must be tested. They require tests to be run as a suite of related and/or unrelated tests in large batches.
Aversan developed the Batch Execution System for Thales Group to manage the utilization of test hardware so that tests could be run based on the availability of the hardware capable of running the tests, and the priority of tests waiting to be run.
• Maximized the testing of hardware utilization
• Optimized the use of resources while minimizing the amount of time needed to obtain results